Essential information for preparation of an offer for CINK Hydro-Power-Plant equipment
I need a price estimation only for feasibility study.
I need a detailed technical and economical offer to decide the investment.
Project name
(for our internal administration it is necessary to have an identifying name which we are going to use during our communication)
Location:
(river, city, country etc.)
Customer
Contact person:
Company:
Phone/Mobile no.:
Address:
Country:
ZIP:
Location:
E-mail:
Web:
Investor
Consulting – Engineering Company.
Owner of the project:
Stage of project development
Feasibility study
Concession is in preparation
Start of construction is planned for:
Concession is already available
Start of construction is planned for:
Refurbishment of existing hydro-power-plant
(please attach the plans and cross-section of the existing structure)
Gross head
(gross head is defined as the vertical distance between upper and tail water level)
For reservoir projects or projects with varying tail water level only:
Gross head max:
Gross head min:
Design gross head:
Net head
(net head is defined as gross head minus hydraulic losses)
For reservoir projects or projects with varying tail water level only:
Net head max:
Net head min:
Design net head:
Back pressure
(if the tail water level exceeds the turbine shaft)
Elevation (a.s.l.)
Upper water level
Tail water level at Qmax:
Tail water level at Qmin:
Lowest possible level of machine room floor:
Flow data
(means usable flow after the hygienic minimum deduction)
Max flow:
During approx. (months/year)
Average flow:
During approx. (months/year)
Min flow:
During approx. (months/year)
Design flow:
A flow duration curve is preferred, if available. It is also important to know if there is any special daily-, nightly-, monthly- or seasonal operation required (drinking water systems, reservoir etc.).
Quality of water
Normal
Extraordinary
(e.g. silt content, ph-value etc.)
Water supply by
Open channel:
Material
Length
width
height
Pipe:
Material
Length
diameter
Penstock:
Material
Length
diameter
Max. permissible pressure rise in the penstock
Is storage available?
Area X
Area Y
Depth
Power production
Generator-Voltage
Grid-Voltage
Frequency
Power supply to utility grid
Stand-alone operation
Equipment to be driven:
Stand-alone operation and power supply to utility grid
in ratio:
Turbine regulation
Manual
(manual turbine operation does not permit automatic operation)
Automatic according to water level
Automatic according other parameters
(flow, pressure etc.)
Installation in drinking water / waste water system
Scope of delivery
Turbine
Speed transmision
(if required)
Generator
Control system
Generator-Switchboard
Service Valve
By-pass Valve
Transformer and output extraction
(we recommend to order this equipment from a local supplier)
Trashrack cleaner
Notes or additional information considered by the customer as important:
Date: