Essential information for preparation of an offer for CINK Hydro-Power-Plant equipment


(for our internal administration it is necessary to have an identifying name which we are going to use during our communication)
(river, city, country etc.)

Customer

Stage of project development
(please attach the plans and cross-section of the existing structure)

(gross head is defined as the vertical distance between upper and tail water level)
For reservoir projects or projects with varying tail water level only:
(net head is defined as gross head minus hydraulic losses)
For reservoir projects or projects with varying tail water level only:
(if the tail water level exceeds the turbine shaft)

Elevation (a.s.l.)

Flow data (means usable flow after the hygienic minimum deduction)
A flow duration curve is preferred, if available. It is also important to know if there is any special daily-, nightly-, monthly- or seasonal operation required (drinking water systems, reservoir etc.).

Quality of water
(e.g. silt content, ph-value etc.)

Water supply by

Power production

Turbine regulation
(manual turbine operation does not permit automatic operation)
(flow, pressure etc.)


Scope of delivery
(if required)
(we recommend to order this equipment from a local supplier)

Copy of this form will be sent to your e-mail address.